RAMS quality grader
Sixteen practical checks across identity, risk assessment, method and control. Three minutes. An A to F grade for a subcontractor's RAMS, the critical gaps flagged separately and copy-ready wording to request a revision.
Who this is for and what it solves
- Principal contractors and site managers accepting subcontractor RAMS
- Ops and compliance leads setting a consistent acceptance standard
- Subcontractors checking their own RAMS before submitting them
RAMS arrive as PDFs of wildly varying quality, and 'is this good enough?' usually comes down to whoever opens it. This grader applies the same sixteen checks every time, separates the critical gaps from the cosmetic ones and gives you the exact revision request to send back.
- 1.The RAMS names this site, this client and these works - not a generic template.Critical
- 2.The author is named, with their role and competence (for example SSSTS or SMSTS).
- 3.The scope states clearly what is included and what is excluded.
- 4.It carries a version number and issue date.
- 5.Hazards are specific to the task, not a copied list of every construction hazard.Critical
- 6.Each hazard names who is at risk, including other trades and the public.
- 7.Each hazard has a rating before controls and a residual rating after controls.
- 8.COSHH assessments are attached for every substance named.
- 9.The method statement reads as a numbered sequence of work, start to finish.Critical
- 10.Plant, access equipment and lifting arrangements are named, with certification referenced.
- 11.The operatives are named or the required cards and tickets are stated (CSCS, IPAF, PASMA).
- 12.Emergency arrangements are covered: rescue, first aid and who calls it.
- 13.It is signed and dated by the subcontractor's responsible person.Critical
- 14.There is a briefing or toolbox-talk record showing operatives received it.
- 15.A review date or review trigger is stated.
- 16.The version you hold is the current one for the works starting this week.Critical
Practical guidance for the person receiving RAMS. Not legal or health and safety advice.
How it works
- Step 1Open the RAMS and answer yes or no
Sixteen checks grouped into four sections. Answer honestly - 'sort of' means no.
- Step 2Get a grade and the critical gaps
An A to F grade with a percentage per section. Six critical checks cap the grade at C when they fail.
- Step 3Send the revision request
Copy or download the result. Every failed check becomes a specific, quotable action.
Questions and answers
Grading one RAMS is easy. Keeping every revision straight is not.
A grade tells you whether today's PDF is acceptable. It cannot tell you which revision was briefed, whose RAMS lapsed at review date or which pack still has a superseded version behind it.
Credbase requests RAMS per job, versions every revision against the subcontractor record and blocks a pack from going out with an unsigned or superseded document behind it.
This tool is a plain-English guide for teams handling third-party paperwork. It is not legal, insurance or compliance advice. Confirm specifics with the counterparty or your own adviser before you rely on any output.
Related free tools
- Subcontractor document checklist generator
Answer a few questions about the trade and the job, get the exact document list to request from a subcontractor, plus a request email and a reminder schedule.
- Supplier document checklist
A tidy starter list of the documents most teams should hold for a new supplier. Tick them off, copy or download.
- Expiry reminder calculator
Enter a document expiry date and get sensible reminder dates plus a calendar file you can drop into Outlook or Google.
Related reading
- Featured guideRAMS: the complete guide to risk assessments and method statements (2026)
What RAMS are, what a good one contains, who writes and approves them, how to review a subcontractor's RAMS in ten minutes and how to keep every document current across live jobs.
- Featured guideSubcontractor compliance management: the complete UK guide
Everything UK construction and field-services teams need to keep subcontractors site-ready, insurance, RAMS, training, right to work, in one live record.
- Featured guideCertificate of insurance (COI) tracking: the complete guide
How modern teams collect, verify and monitor certificates of insurance from suppliers and subcontractors, without spreadsheets or missed renewals.